Hi all
I see there has not been a lot happening on here for a while, but just thought I would post the following link regarding the possible manufacturing of halftrack tracks in the US. The leg work being done here could very easily be adapted to the Cletrac track at very reasonable cost!!!
http://g503.com/forums/viewtopic.php?f=24&t=228085
It would all come down to how many tracks are required.
Anyway food for thought
Cheers
Paul